Fuel spend$02023 · no purchased fuel
Capacity in service1.5MW2 units · storage + solar
Rank in Washington#125 (tied)of 128 · by capacity · #11,232 (tied) of 13,147 US
All 2 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases.
See the engineering record →
How big is Arlington Microgrid?
1.5 MW across 2 generating units in service — 1.0 MW of storage and 0.5 MW of solar.
Who owns and operates it?
Operated by PUD No 1 of Snohomish County, filed as political subdivision.
Which grid does it sell into?
BPAT (Bonneville Power Administration) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2020. The oldest operating unit is Unit AMGPV (2019); the newest is Unit AMGB (2021).
When is it due to retire?
No retirement date has been filed for any operating unit at Arlington Microgrid. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Batteries (1.0 MW) and Solar Photovoltaic (0.5 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (batteries and solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.