Ashland, Benton County, Mississippi · TVA · operated by Tennessee Valley Authority · owned by US Government
2023 · headline year
The 3rd-largest power plant in Mississippi by capacity — 1,004 MW, 100% natural gas by fuel energy in 2023, first unit online in 2003.
Reported fuel cost$125M2023 · reported deliveries
Capacity in service1,004MW6 units · gas
Net generation5.81TWh2023 · reported
CO₂ emitted2.32Mt2023 · reported to EPA · 250th highest of 6,030 in the US
Rank in Mississippi#3of 59 · by capacity · #307 of 13,147 US
Reported suppliers12023 · 12 deliveries
Capacity factor66%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 40.2 TBtu · reported
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
6 of 6 shown · 1,004 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit CTG1
178.5
Natural Gas
Natural Gas Fired Combined Cycle
2003
Operating
Unit CTG2
178.5
Natural Gas
Natural Gas Fired Combined Cycle
2003
Operating
Unit CTG3
178.5
Natural Gas
Natural Gas Fired Combined Cycle
2003
Operating
Unit STG1
156.0
Natural Gas
Natural Gas Fired Combined Cycle
2003
Operating
Unit STG2
156.0
Natural Gas
Natural Gas Fired Combined Cycle
2003
Operating
Unit STG3
156.0
Natural Gas
Natural Gas Fired Combined Cycle
2003
Operating
All 6 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
The supplier is shown. Subscribe to see every one of the 155 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
Owned by US Government and operated by Tennessee Valley Authority, filed as federally owned utility.
Which grid does it sell into?
TVA (Tennessee Valley Authority) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2003. Every operating unit came online in 2003.
When is it due to retire?
No retirement date has been filed for any operating unit at Magnolia Facility. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $125M in 2023.
How much CO₂ does it emit?
2.32 Mt in 2023, reported to the EPA — the 250th highest of 6,030 US facilities that reported. Up from 1.14 Mt in 2011.