Escatawpa, Jackson County, Mississippi · SOCO · operated by Mississippi Power Co · owned by The Southern Co and Nextera Energy Inc
The largest power plant in Mississippi by capacity — 2,229 MW, 78% natural gas by fuel energy in 2023, first unit online in 1977, newest in 2001.
Natural gas supplies 78% of the fuel energy it burned in 2023.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit 1 | 548.3 | Subbituminous | Conventional Steam Coal | 1977 | Operating |
| Unit 2 | 548.3 | Subbituminous | Conventional Steam Coal | 1981 | Operating |
| Unit 3ST | 195.2 | Natural Gas | Natural Gas Fired Combined Cycle | 2001 | Operating |
| Unit 4ST | 195.2 | Natural Gas | Natural Gas Fired Combined Cycle | 2001 | Operating |
| Unit 3 | 185.5 | Natural Gas | Natural Gas Fired Combined Cycle | 2001 | Operating |
| Unit 3CT | 185.5 | Natural Gas | Natural Gas Fired Combined Cycle | 2001 | Operating |
| Unit 4 | 185.5 | Natural Gas | Natural Gas Fired Combined Cycle | 2001 | Operating |
| Unit 4CT | 185.5 | Natural Gas | Natural Gas Fired Combined Cycle | 2001 | Operating |
All 8 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height; ownership stakes where a unit is jointly held.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit 1 | retirement | 2027-12 | 548 MW |
| Unit 2 | retirement | 2027-12 | 548 MW |
| Supplier | Fuel | Delivered TBtu | Tons | Mine of origin | Transport |
|---|---|---|---|---|---|
| Arch Coal Sales Company Inc. | Coal | 12.4 | 678,383 | Black Thunder, Wyoming + 1 more | Rail |
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
Showing 1 of 4 suppliers. Subscribe to see all 4, every one of the 565 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
See all 4 suppliers →