The largest reported CO₂ emitter among facilities in California — 6.12 Mt in 2023, first unit online in 1982, newest in 1991, a retirement filed for 2025.

Fuel spend$201M2023 · estimate
Capacity in service488MW9 units · gas
Net generation2.66TWh2023 · reported
CO₂ emitted6.12Mt2023 · reported to EPA for the whole site, which is larger than the plant shown here · 43rd highest of 6,030 in the US
Rank in California#39of 1,713 · by capacity · #722 of 13,147 US
Reported suppliers12023 · 12 deliveries
Capacity factor62%2023

Location

Los Angeles County · CAISO / LDWP · WECC

What its on-site power plant burns

2023 · reported

Share of reported fuel consumption

71% Natural gas · 25.1 TBtu · reported · $200M est.28% Refinery gas · 10.1 TBtu · reported1% Oil & petroleum · 0.344 TBtu · reported · $54,523 est.

Natural gas supplies 71% of the fuel energy its on-site power plant burned in 2023.

CO₂ emitted, Mt · 2011–2023

02.557.5201120172023
Reported (through 2023)

Generating units

10 of 10 shown · 488 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GN9182.0Natural GasNatural Gas Fired Combined Cycle1988Operating
Unit GN9282.0Natural GasNatural Gas Fired Combined Cycle1988Operating
Unit GN9382.0Natural GasNatural Gas Fired Combined Cycle1988Operating
Unit GN9482.0Natural GasNatural Gas Fired Combined Cycle1987Operating
Unit GN9538.5Natural GasNatural Gas Fired Combined Cycle1988Operating
Unit GN9638.5Natural GasNatural Gas Fired Combined Cycle1987Operating
Unit GEN130.0Other gasOther Gases1982Operating
Unit GEN230.0Other gasOther Gases1982Operating
Unit GEN323.0Other gasOther Gases1991Operating
Unit GN9794.2Natural GasNatural Gas Fired Combined Cyclenot reportedCanceled

All 10 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; ownership stakes where a unit is jointly held.

See the engineering record →
UnitEventWhenMW
Unit GEN2retirement2025-0630.0 MW
Unit GEN1retirement2025-0930.0 MW
Unit GEN3retirement2025-0923.0 MW

Who supplies the fuel

1 of 1 supplier · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
TesoroNatural gas24.8n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

The supplier is shown. Subscribe to see every one of the 228 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Marathon Petroleum Corp · 100%
Operating utilities
ARCO Products Co-Watson (EIA plant 50216)
Tesoro Refining and Marketing Company (EIA plant 50530)
Entity type
Independent Power Producer; Industrial
Regulatory status
Not Regulated
Industry sector
Chemicals, Other, Refineries, Suppliers of CO2
EPA facility ID
1006627
Balancing authority
CAISO / LDWP
NERC region
WECC
EIA plant IDs
50216 · 50530

Common questions

How big is Los Angeles Refinery (LAR)?
488 MW across 9 generating units in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled. The total spans EIA plants 50216 and 50530, filed under one facility.
Who owns and operates it?
Owned by Marathon Petroleum Corp (100%) and operated by ARCO Products Co-Watson (EIA plant 50216) and Tesoro Refining and Marketing Company (EIA plant 50530).
Which grid does it sell into?
CAISO / LDWP (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1987. The oldest operating units are Unit GEN1 and Unit GEN2 (1982); the newest is Unit GEN3 (1991).
When is it due to retire?
Planned retirement dates are filed for 3 of 9 operating units: Unit GEN1 (2025), Unit GEN2 (2025) and Unit GEN3 (2025).
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned natural gas, refinery gas and oil & petroleum. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
An estimated $201M in 2023 — natural gas $200M and oil & petroleum $54,523. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
6.12 Mt in 2023, reported to the EPA — the 43rd highest of 6,030 US facilities that reported. Up from 4.43 Mt in 2011.

Also at this site

BP Carson RefinerySame site · standby or out of service→

Related pages

California energyAll facilities in the state→McCoy Solar Energy Project Hybrid501 MW operating capacity→ Walnut Creek Energy, LLC.500 MW operating capacity→ Solar Blue475 MW operating capacity→ Eland Solar & Storage Center, Phase 1 Hy460 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming