Carson, Los Angeles County, California · CAISO / LDWP · operated by ARCO Products Co-Watson (EIA plant 50216) and Tesoro Refining and Marketing Company (EIA plant 50530) · owned by Marathon Petroleum Corp
2023 · headline year
The largest reported CO₂ emitter among facilities in California — 6.12 Mt in 2023, first unit online in 1982, newest in 1991, a retirement filed for 2025.
Fuel spend$201M2023 · estimate
Capacity in service488MW9 units · gas
Net generation2.66TWh2023 · reported
CO₂ emitted6.12Mt2023 · reported to EPA for the whole site, which is larger than the plant shown here · 43rd highest of 6,030 in the US
Rank in California#39of 1,713 · by capacity · #722 of 13,147 US
Reported suppliers12023 · 12 deliveries
Capacity factor62%2023
Location
What its on-site power plant burns
2023 · reported
Share of reported fuel consumption
71% Natural gas · 25.1 TBtu · reported · $200M est.28% Refinery gas · 10.1 TBtu · reported1% Oil & petroleum · 0.344 TBtu · reported · $54,523 est.
Natural gas supplies 71% of the fuel energy its on-site power plant burned in 2023.
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
10 of 10 shown · 488 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit GN91
82.0
Natural Gas
Natural Gas Fired Combined Cycle
1988
Operating
Unit GN92
82.0
Natural Gas
Natural Gas Fired Combined Cycle
1988
Operating
Unit GN93
82.0
Natural Gas
Natural Gas Fired Combined Cycle
1988
Operating
Unit GN94
82.0
Natural Gas
Natural Gas Fired Combined Cycle
1987
Operating
Unit GN95
38.5
Natural Gas
Natural Gas Fired Combined Cycle
1988
Operating
Unit GN96
38.5
Natural Gas
Natural Gas Fired Combined Cycle
1987
Operating
Unit GEN1
30.0
Other gas
Other Gases
1982
Operating
Unit GEN2
30.0
Other gas
Other Gases
1982
Operating
Unit GEN3
23.0
Other gas
Other Gases
1991
Operating
Unit GN97
94.2
Natural Gas
Natural Gas Fired Combined Cycle
not reported
Canceled
All 10 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; ownership stakes where a unit is jointly held.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
The supplier is shown. Subscribe to see every one of the 228 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
488 MW across 9 generating units in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled. The total spans EIA plants 50216 and 50530, filed under one facility.
Who owns and operates it?
Owned by Marathon Petroleum Corp (100%) and operated by ARCO Products Co-Watson (EIA plant 50216) and Tesoro Refining and Marketing Company (EIA plant 50530).
Which grid does it sell into?
CAISO / LDWP (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1987. The oldest operating units are Unit GEN1 and Unit GEN2 (1982); the newest is Unit GEN3 (1991).
When is it due to retire?
Planned retirement dates are filed for 3 of 9 operating units: Unit GEN1 (2025), Unit GEN2 (2025) and Unit GEN3 (2025).
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned natural gas, refinery gas and oil & petroleum. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
An estimated $201M in 2023 — natural gas $200M and oil & petroleum $54,523. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
6.12 Mt in 2023, reported to the EPA — the 43rd highest of 6,030 US facilities that reported. Up from 4.43 Mt in 2011.