Capacity in service460MW2 units · solar + storage · incl. 460 MW online after 2023
Rank in California#41of 1,713 · by capacity · #757 of 13,147 US
All 2 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases; ownership stakes where a unit is jointly held.
See the engineering record →
How big is Eland Solar & Storage Center, Phase 1 Hy?
460 MW across 2 generating units in service — 310 MW of solar and 150 MW of storage.
Who owns and operates it?
Operated by 68SF 8me LLC, filed as independent power producer.
Which grid does it sell into?
LDWP (Los Angeles Department of Water and Power) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2024. Every operating unit came online in 2024.
When is it due to retire?
No retirement date has been filed for any operating unit at Eland Solar & Storage Center, Phase 1 Hy. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (310 MW) and Batteries (150 MW).