Labadie, Franklin County, Missouri · MISO · operated by Union Electric Co - (MO) · owned by Ameren Corp
2023 · headline year
The largest power plant in Missouri by capacity — 2,389 MW, 100% coal by fuel energy in 2023, first unit online in 1970.
Reported fuel cost$267M2023 · reported deliveries
Capacity in service2,389MW4 units · coal
Net generation15.8TWh2023 · reported
CO₂ emitted15.4Mt2023 · reported to EPA · 2nd highest of 6,030 in the US
Rank in Missouri#1of 119 · by capacity · #43 of 13,147 US
Reported suppliers42023 · 57 deliveries
Capacity factor75%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Coal · 171 TBtu · reported
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
4 of 4 shown · 2,389 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 3
621.0
Subbituminous
Conventional Steam Coal
1972
Operating
Unit 4
621.0
Subbituminous
Conventional Steam Coal
1973
Operating
Unit 1
573.7
Subbituminous
Conventional Steam Coal
1970
Operating
Unit 2
573.7
Subbituminous
Conventional Steam Coal
1971
Operating
All 4 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
Showing 1 of 4 suppliers. Subscribe to see all 4, every one of the 1,226 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
Owned by Ameren Corp (100%) and operated by Union Electric Co - (MO), filed as investor-owned utility.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1972. The oldest operating unit is Unit 1 (1970); the newest is Unit 4 (1973).
When is it due to retire?
No retirement date has been filed for any operating unit at Labadie. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned coal. Coal delivered in 2023 came from 3 coal suppliers, from mines in Wyoming — principally Black Thunder. Other fuels (oil & petroleum) came from 1 supplier in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $267M in 2023.
How much CO₂ does it emit?
15.4 Mt in 2023, reported to the EPA — the 2nd highest of 6,030 US facilities that reported. Down from 18.2 Mt in 2011.