The 2nd-largest reported CO₂ emitter among facilities in Missouri — 5.96 Mt in 2023, 100% coal by fuel energy in 2023, first unit online in 1966, newest in 1982.
Fuel spend$127M2023 · estimate
Capacity in service1,182MW3 units · coal
Net generation5.94TWh2023 · reported
CO₂ emitted5.96Mt2023 · reported to EPA · 47th highest of 6,030 in the US
Rank in Missouri#5of 119 · by capacity · #238 of 13,147 US
Reported suppliers22023 · 20 deliveries
Capacity factor57%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Coal · 59 TBtu · reported · $126M est.
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
3 of 3 shown · 1,182 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 3
738.0
Subbituminous
Conventional Steam Coal
1982
Operating
Unit 2
272.0
Subbituminous
Conventional Steam Coal
1969
Operating
Unit 1
171.7
Subbituminous
Conventional Steam Coal
1966
Operating
All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
Showing 1 of 2 suppliers. Subscribe to see all 2, every one of the 213 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
AECI (Associated Electric Cooperative, Inc.) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1977. The oldest operating unit is Unit 1 (1966); the newest is Unit 3 (1982).
When is it due to retire?
No retirement date has been filed for any operating unit at Thomas Hill Energy Center. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned coal. Coal delivered in 2023 came from 1 coal supplier, from mines in Wyoming — principally North Antelope Rochelle Mine. Other fuels (oil & petroleum) came from 1 supplier in 2023.
How much does it spend on fuel?
An estimated $127M in 2023 — coal $126M and oil & petroleum $1.33M. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
5.96 Mt in 2023, reported to the EPA — the 47th highest of 6,030 US facilities that reported. Down from 8.4 Mt in 2011.