Kake

Wrangell Petersburg, Alaska · operated by Inside Passage Elec Coop, Inc

2023 · headline year
Capacity in service3.1MW5 units · oil
Net generation1.51GWh2023 · reported
Rank in Alaska#79 (tied)of 142 · by capacity · #8,715 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor6%2023

What it burns

2023 · reported

Share of reported fuel consumption

100% Oil & petroleum · 18,182 MMBtu · reported

Reported fuel consumption, MMBtu · 2011–2023

020,00040,00060,000201120172023
Reported (through 2023)

Generating units

8 of 8 shown · 3.1 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 21.1Distillate oilPetroleum Liquids1993Operating
Unit 1B0.5Distillate oilPetroleum Liquids2017Operating
Unit 2A0.5Distillate oilPetroleum Liquids2017Operating
Unit 3B0.5Distillate oilPetroleum Liquids2017Operating
Unit 40.5Distillate oilPetroleum Liquids2017Operating
Unit 3A0.8Distillate oilPetroleum Liquids1993Retired 2017
Unit 10.6Distillate oilPetroleum Liquids1984Retired 2012
Unit 1A0.5Distillate oilPetroleum Liquids2012Retired 2017

All 8 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Inside Passage Elec Coop, Inc
Entity type
Cooperative
Regulatory status
Regulated
EIA plant ID
7464

Common questions

How big is Kake?
3.1 MW across 5 generating units in service. A further 3 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Inside Passage Elec Coop, Inc, filed as cooperative.
How old is it?
The capacity-weighted average megawatt here came online in 2008. The oldest operating unit is Unit 2 (1993); the newest are Unit 1B, Unit 2A, Unit 3B and Unit 4 (2017).
When is it due to retire?
No retirement date has been filed for any operating unit at Kake. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned oil & petroleum.

Related pages

Alaska energyAll facilities in the state→Seldovia3.2 MW operating capacity→ Galena Electric Utility3.1 MW operating capacity→ NSB Point Hope Utility3.1 MW operating capacity→ ESS Battery Microgrid3.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming