Capacity in service3.1MW5 units · oil
Rank in Alaska#79 (tied)of 142 · by capacity · #8,715 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

Yukon Koyukuk

Reported fuel consumption, MMBtu · 2011–2022

025,00050,00075,000201120162022
Reported (through 2022)

Generating units

13 of 13 shown · 3.1 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 4A1.0Distillate oilPetroleum Liquids2004Operating
Unit 5A0.8Distillate oilPetroleum Liquids2009Operating
Unit 2A0.5Distillate oilPetroleum Liquids2015Operating
Unit 3B0.4Distillate oilPetroleum Liquids2022Operating
Unit 6B0.4Distillate oilPetroleum Liquids2022Operating
Unit 1A0.8Distillate oilPetroleum Liquids1999Retired 2022
Unit 20.8Distillate oilPetroleum Liquids1990Retired 2013
Unit 30.8Distillate oilPetroleum Liquids1990Retired 2009
Unit 3A0.8Distillate oilPetroleum Liquids2009Retired 2022
Unit 40.8Distillate oilPetroleum Liquids1990Retired 2003
Unit 50.8Distillate oilPetroleum Liquids1990Retired 2008
Unit 60.5Distillate oilPetroleum Liquids2013Retired 2016
Unit 6A0.4Distillate oilPetroleum Liquids1997Retired 2008

All 13 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Galena Electric Utility
Entity type
Municipally Owned Utility
Regulatory status
Regulated
EIA plant ID
7437

Common questions

How big is Galena Electric Utility?
3.1 MW across 5 generating units in service. A further 8 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Galena Electric Utility, filed as municipally owned utility.
How old is it?
The capacity-weighted average megawatt here came online in 2012. The oldest operating unit is Unit 4A (2004); the newest are Unit 3B and Unit 6B (2022).
When is it due to retire?
No retirement date has been filed for any operating unit at Galena Electric Utility. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
Its generating units are fuelled by distillate oil.

Related pages

Alaska energyAll facilities in the state→NSB Atqasuk Utility3.2 MW operating capacity→ Seldovia3.2 MW operating capacity→ Kake3.1 MW operating capacity→ NSB Point Hope Utility3.1 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming