AMERICAN ENERGY ATLAS
Power·Kentucky

John S. Cooper

Somerset, Pulaski County, Kentucky · PJM · operated by East Kentucky Power Coop, Inc · owned by East Kentucky Power Cooperative Inc

2023 · headline year
Reported fuel cost$36.2M2023 · reported deliveries
Capacity in service344MW2 units · coal
Net generation477GWh2023 · reported
CO₂ emitted484,225t2023 · reported to EPA · 950th highest of 6,030 in the US
Rank in Kentucky#15of 58 · by capacity · #905 of 13,147 US
Capacity factor16%2023

Location

Pulaski County · PJM · SERC

What it burns

2023 · reported

Share of reported fuel consumption

99% Coal · 5.05 TBtu · reported1% Oil & petroleum · 0.0274 TBtu · reported

Coal supplies 99% of the fuel energy it burned in 2023.

CO₂ emitted, Mt · 2011–2023

0123201120172023
Reported (through 2023)

Generating units

2 of 2 shown · 344 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 2230.4Bituminous coalConventional Steam Coal1969Operating
Unit 1113.6Bituminous coalConventional Steam Coal1965Operating

All 2 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.

See the engineering record →

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
East Kentucky Power Coop, Inc
Entity type
Cooperative
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1007788
Balancing authority
PJM
NERC region
SERC
EIA plant ID
1384

Common questions

How big is John S. Cooper?
344 MW across 2 generating units in service.
Who owns and operates it?
Owned by East Kentucky Power Cooperative Inc (100%) and operated by East Kentucky Power Coop, Inc, filed as cooperative.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1968. The oldest operating unit is Unit 1 (1965); the newest is Unit 2 (1969).
When is it due to retire?
No retirement date has been filed for any operating unit at John S. Cooper. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned coal and oil & petroleum.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $36.2M in 2023.
How much CO₂ does it emit?
484,225 t in 2023, reported to the EPA — the 950th highest of 6,030 US facilities that reported. Down from 1.53 Mt in 2011.

Related pages

Kentucky energyAll facilities in the state→R D Green586 MW operating capacity→ D B Wilson509 MW operating capacity→ Big Sandy280 MW operating capacity→ Wolf Creek270 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming