Delta, Millard County, Utah · LDWP · operated by Los Angeles Department of Water & Power · owned by Intermountain Power Agency
2023 · headline year
The largest power plant in Utah by capacity — 1,640 MW, 100% coal by fuel energy in 2023, first unit online in 1986.
Reported fuel cost$108M2023 · reported deliveries
Capacity in service1,640MW2 units · coal
Net generation4.45TWh2023 · reported
CO₂ emitted4.43Mt2023 · reported to EPA · 86th highest of 6,030 in the US
Rank in Utah#1of 123 · by capacity · #129 of 13,147 US
Reported suppliers62023 · 51 deliveries
Capacity factor31%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Coal · 46.6 TBtu · reported
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
4 of 4 shown · 1,640 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 1
820.0
Bituminous coal
Conventional Steam Coal
1986
Operating
Unit 2
820.0
Bituminous coal
Conventional Steam Coal
1987
Operating
Unit 3
420.0
Natural Gas
Natural Gas Fired Combined Cycle
2025
Proposed
Unit 4
420.0
Natural Gas
Natural Gas Fired Combined Cycle
2025
Proposed
All 4 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height; ownership stakes where a unit is jointly held.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only. Deliveries and consumption are reported separately and need not match in a year (stockpiles, and pipeline gas that fuel receipts do not capture).
Showing 1 of 6 suppliers. Subscribe to see all 6, every one of the 863 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
1,640 MW across 2 generating units in service. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Intermountain Power Agency (100%) and operated by Los Angeles Department of Water & Power, filed as municipally owned utility.
Which grid does it sell into?
LDWP (Los Angeles Department of Water and Power) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1987. The oldest operating unit is Unit 1 (1986); the newest is Unit 2 (1987).
When is it due to retire?
Planned retirement dates are filed for 2 of 2 operating units: Unit 1 (2025) and Unit 2 (2025).
What does it burn, and where does the fuel come from?
In 2023 it burned coal. Coal delivered in 2023 came from 5 coal suppliers, from mines in Utah, Colorado and Wyoming — principally Sufco. Other fuels (oil & petroleum) came from 1 supplier in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $108M in 2023.
How much CO₂ does it emit?
4.43 Mt in 2023, reported to the EPA — the 86th highest of 6,030 US facilities that reported. Down from 11.8 Mt in 2011.