Mona, Juab County, Utah · PACE · operated by PacifiCorp · owned by Berkshire Hathaway Inc

2023 · headline year
Reported fuel cost$173M2023 · reported deliveries
Capacity in service567MW3 units · gas
Net generation2.88TWh2023 · reported
CO₂ emitted1.15Mt2023 · reported to EPA · 529th highest of 6,030 in the US
Rank in Utah#5of 123 · by capacity · #624 of 13,147 US
Reported suppliers12023 · 12 deliveries
Capacity factor58%2023

Location

Juab County · PACE · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 21.3 TBtu · reported

CO₂ emitted, Mt · 2011–2023

00.511.5201120172023
Reported (through 2023)

Generating units

3 of 3 shown · 567 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit ST1274.5Natural GasNatural Gas Fired Combined Cycle2006Operating
Unit CT1A146.2Natural GasNatural Gas Fired Combined Cycle2005Operating
Unit CT1B146.2Natural GasNatural Gas Fired Combined Cycle2005Operating

All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.

See the engineering record →

Who supplies the fuel

1 of 1 supplier · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
DominionNatural gas21.3n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

The supplier is shown. Subscribe to see every one of the 155 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Berkshire Hathaway Inc · 100%
Operating utility
PacifiCorp
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1000436
Balancing authority
PACE
NERC region
WECC
EIA plant ID
56102

Common questions

How big is Currant Creek Power Project?
567 MW across 3 generating units in service.
Who owns and operates it?
Owned by Berkshire Hathaway Inc (100%) and operated by PacifiCorp, filed as investor-owned utility.
Which grid does it sell into?
PACE (PacifiCorp - East) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2005. The oldest operating units are Unit CT1A and Unit CT1B (2005); the newest is Unit ST1 (2006).
When is it due to retire?
No retirement date has been filed for any operating unit at Currant Creek Power Project. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $173M in 2023.
How much CO₂ does it emit?
1.15 Mt in 2023, reported to the EPA — the 529th highest of 6,030 US facilities that reported. Up from 887,232 t in 2011.

Related pages

Utah energyAll facilities in the state→Lake Side Power Plant1,246 MW operating capacity→ Huntington1,016 MW operating capacity→ Faraday Solar525 MW operating capacity→ Bonanza512 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming