Washington County, Utah · PACE · operated by Hurricane City Power
Natural gas supplies 97% of the fuel energy it burned in 2023.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit 4 | 2.0 | Natural Gas | Natural Gas Internal Combustion Engine | 2004 | Operating |
| Unit 5 | 2.0 | Natural Gas | Natural Gas Internal Combustion Engine | 2004 | Operating |
| Unit 6 | 2.0 | Natural Gas | Natural Gas Internal Combustion Engine | 2006 | Operating |
| Unit 7 | 2.0 | Natural Gas | Natural Gas Internal Combustion Engine | 2007 | Operating |
| Unit 8 | 2.0 | Natural Gas | Natural Gas Internal Combustion Engine | 2007 | Operating |
| Unit 1 | 1.7 | Distillate oil | Petroleum Liquids | 2001 | Standby |
| Unit 2 | 1.7 | Distillate oil | Petroleum Liquids | 1999 | Standby |
| Unit 3 | 1.7 | Distillate oil | Petroleum Liquids | 1999 | Standby |
| Unit 9 | 2.0 | Natural Gas | Natural Gas Internal Combustion Engine | 2026 | Proposed |
All 9 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit 9 | new unit | 2026 | 2.0 MW |