AMERICAN ENERGY ATLAS
Power·Pennsylvania

Hunlock Unit 4

Hunlock Creek, Luzerne County, Pennsylvania · PJM · operated by Hunlock Energy, LLC · owned by UGI Corp

2023 · headline year
Fuel spend$1.55M2023 · estimate
Capacity in service44.0MW1 unit · gas
Net generation50.3GWh2023 · reported
CO₂ emitted26,303t2023 · reported to EPA · 5,034th highest of 6,030 in the US
Rank in Pennsylvania#97of 256 · by capacity · #3,676 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor13%2023

Location

Luzerne County · PJM · RFC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 503,863 MMBtu · reported · $1.55M est.

CO₂ emitted, t · 2011–2023

010,00020,00030,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 44.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 444.0Natural GasNatural Gas Fired Combustion Turbine2000Operating

1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
UGI Corp · 100%
Operating utility
Hunlock Energy, LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Industry sector
Power Plants
EPA facility ID
1000484
Balancing authority
PJM
NERC region
ReliabilityFirst (RFC)
Gas pipeline
Transcontinental Gas Pipeline
EIA plant ID
56397

Common questions

How big is Hunlock Unit 4?
44.0 MW across 1 generating unit in service.
Who owns and operates it?
Owned by UGI Corp (100%) and operated by Hunlock Energy, LLC, filed as independent power producer.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 2000.
When is it due to retire?
No retirement date has been filed for any operating unit at Hunlock Unit 4. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $1.55M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
26,303 t in 2023, reported to the EPA — the 5,034th highest of 6,030 US facilities that reported. Up from 3,822 t in 2011.

Related pages

Pennsylvania energyAll facilities in the state→Sandy Ridge Wind Farm50.0 MW operating capacity→ Mt. Carmel Cogeneration47.3 MW operating capacity→ Wallenpaupack40.0 MW operating capacity→ Ringer Hill Wind Farm, LLC39.9 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming