Maricopa County, Arizona · SRP · operated by Salt River Project
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit HM4 | 99.8 | Water | Hydroelectric Pumped Storage | 1927 | Operating |
| Unit HM3 | 11.7 | Water | Conventional Hydroelectric | 1927 | Operating |
| Unit HM1 | 9.9 | Water | Conventional Hydroelectric | 1927 | Operating |
| Unit HM2 | 9.9 | Water | Conventional Hydroelectric | 1927 | Operating |
All 4 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit HM3 | uprate | 2025-04 | 0.7 MW |