Hennepin County Energy Center

Minneapolis, Hennepin County, Minnesota · MISO · operated by Covanta Energy Co · owned by Hennepin County Minnesota

2023 · headline year
Fuel spend$2.97M2023 · estimate
Capacity in service39.5MW1 unit · waste
Net generation199GWh2023 · reported
CO₂ emitted31,326t2023 · reported to EPA · 4,651st highest of 6,030 in the US
Rank in Minnesota#73 (tied)of 767 · by capacity · #3,798 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor57%2023

Location

Hennepin County · MISO · MRO

CO₂ emitted, t · 2011–2023

020,00040,00060,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 39.5 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN139.5Municipal solid wasteMunicipal Solid Waste1989Operating

1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; stack height; ownership stakes where a unit is jointly held.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Hennepin County Minnesota · 100%
Operating utility
Covanta Energy Co
Entity type
Municipally Owned Utility
Regulatory status
Not Regulated
Industry sector
Power Plants
EPA facility ID
1005637
Balancing authority
MISO
NERC region
MRO
EIA plant ID
10013

Common questions

How big is Hennepin County Energy Center?
39.5 MW across 1 generating unit in service.
Who owns and operates it?
Owned by Hennepin County Minnesota (100%) and operated by Covanta Energy Co, filed as municipally owned utility.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 1989.
When is it due to retire?
No retirement date has been filed for any operating unit at Hennepin County Energy Center. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
Its generating units are fuelled by municipal solid waste.
How much does it spend on fuel?
An estimated $2.97M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
31,326 t in 2023, reported to the EPA — the 4,651st highest of 6,030 US facilities that reported. Up from 28,666 t in 2011.

Related pages

Minnesota energyAll facilities in the state→Oak Glen Wind Farm44.0 MW operating capacity→ G McNeilus Wind Farm Dodge Center43.0 MW operating capacity→ Glencoe39.5 MW operating capacity→ Fairmont (MN)39.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming