AMERICAN ENERGY ATLAS
Power·Minnesota

Glencoe

McLeod County, Minnesota · MISO · operated by Glencoe Light & Power Comm

2023 · headline year
Fuel spend$24,6002023 · estimate
Capacity in service39.5MW8 units · oil
Net generation111MWh2023 · reported
Rank in Minnesota#73 (tied)of 767 · by capacity · #3,798 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor0%2023

Location

McLeod County · MISO · MRO

What it burns

2023 · reported

Share of reported fuel consumption

95% Oil & petroleum · 1,138 MMBtu · reported · $24,333 est.5% Natural gas · 54 MMBtu · reported · $267 est.

Oil & petroleum supplies 95% of the fuel energy it burned in 2023.

Reported fuel consumption, MMBtu · 2011–2023

02,0004,0006,000201120172023
Reported (through 2023)

Generating units

9 of 9 shown · 39.5 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 97.1Distillate oilPetroleum Liquids1973Operating
Unit 107.0Distillate oilPetroleum Liquids1985Operating
Unit 85.6Distillate oilPetroleum Liquids1969Operating
Unit 114.8Distillate oilPetroleum Liquids1998Operating
Unit 124.8Distillate oilPetroleum Liquids1998Operating
Unit 144.8Distillate oilPetroleum Liquids2006Operating
Unit 74.1Distillate oilPetroleum Liquids1966Operating
Unit 51.3Distillate oilPetroleum Liquids1957Operating
Unit 61.3Distillate oilPetroleum Liquids1961Retired 2013

All 9 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Glencoe Light & Power Comm
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Balancing authority
MISO
NERC region
MRO
EIA plant ID
1975

Common questions

How big is Glencoe?
39.5 MW across 8 generating units in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Glencoe Light & Power Comm, filed as municipally owned utility.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 1983. The oldest operating unit is Unit 5 (1957); the newest is Unit 14 (2006).
When is it due to retire?
No retirement date has been filed for any operating unit at Glencoe. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned oil & petroleum and natural gas.
How much does it spend on fuel?
An estimated $24,600 in 2023 — oil & petroleum $24,333 and natural gas $267. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Minnesota energyAll facilities in the state→G McNeilus Wind Farm Dodge Center43.0 MW operating capacity→ Hennepin County Energy Center39.5 MW operating capacity→ Fairmont (MN)39.0 MW operating capacity→ Owatonna Energy Station38.8 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming