Amarillo, Potter County, Texas · SPP · operated by Southwestern Public Service Co · owned by Xcel Energy Inc
Coal supplies 99% of the fuel energy it burned in 2023.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit 1 | 360.0 | Natural Gas | Natural Gas Steam Turbine | 1976 | Operating |
| Unit 2 | 360.0 | Subbituminous | Conventional Steam Coal | 1978 | Operating |
| Unit 3 | 360.0 | Subbituminous | Conventional Steam Coal | 1980 | Operating |
All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit 1 | repowering | 2025-02 | 360 MW |
| Unit 2 | repowering | 2025-03 | 360 MW |
| Unit 3 | repowering | 2025-06 | 360 MW |
| Unit 1 | retirement | 2036-12 | 360 MW |
| Unit 2 | retirement | 2038-12 | 360 MW |
| Unit 3 | retirement | 2040-12 | 360 MW |