Corpus Christi, Nueces County, Texas · ERCOT · operated by City of San Antonio - (TX) · owned by Talen Energy Corp
2023 · headline year
Fuel spend$35.3M2023 · estimate
Capacity in service1,082MW4 units · gas
Net generation1.54TWh2023 · reported
CO₂ emitted717,549t2023 · reported to EPA · 769th highest of 6,030 in the US
Rank in Texas#28of 941 · by capacity · #279 of 13,147 US
Reported suppliers22023 · 12 deliveries
Capacity factor16%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 13.1 TBtu · reported · $35.3M est.
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
4 of 4 shown · 1,082 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 1
352.0
Natural Gas
Natural Gas Steam Turbine
1974
Operating
Unit 2
351.0
Natural Gas
Natural Gas Fired Combined Cycle
1976
Operating
Unit 3
189.6
Natural Gas
Natural Gas Fired Combined Cycle
2010
Operating
Unit 4
189.6
Natural Gas
Natural Gas Fired Combined Cycle
2010
Operating
All 4 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
Showing 1 of 2 suppliers. Subscribe to see all 2, every one of the 152 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
Owned by Talen Energy Corp (100%) and operated by City of San Antonio - (TX), filed as municipally owned utility.
Which grid does it sell into?
ERCOT (Electric Reliability Council of Texas, Inc.) is its balancing authority, inside NERC's Texas RE region.
How old is it?
The capacity-weighted average megawatt here came online in 1987. The oldest operating unit is Unit 1 (1974); the newest are Unit 3 and Unit 4 (2010).
When is it due to retire?
No retirement date has been filed for any operating unit at Barney M. Davis. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 2 suppliers in 2023.
How much does it spend on fuel?
An estimated $35.3M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
717,549 t in 2023, reported to the EPA — the 769th highest of 6,030 US facilities that reported. Down from 985,665 t in 2011.