AMERICAN ENERGY ATLAS
Power·Tennessee

Gallatin

Gallatin, Sumner County, Tennessee · TVA · operated by Tennessee Valley Authority · owned by US Government

2023 · headline year

The 2nd-largest reported CO₂ emitter among facilities in Tennessee — 4.21 Mt in 2023, 98% coal by fuel energy in 2023, first unit online in 1956, newest in 2000.

Fuel spend$152M2023 · estimate
Capacity in service1,918MW12 units · coal + gas
Net generation3.75TWh2023 · reported
CO₂ emitted4.21Mt2023 · reported to EPA · 91st highest of 6,030 in the US
Rank in Tennessee#4of 87 · by capacity · #79 of 13,147 US
Capacity factor22%2023

Location

Sumner County · TVA · SERC

What it burns

2023 · reported

Share of reported fuel consumption

98% Coal · 41.6 TBtu · reported · $147M est.2% Natural gas · 0.765 TBtu · reported · $2.08M est.

Coal supplies 98% of the fuel energy it burned in 2023.

CO₂ emitted, Mt · 2011–2023

02.557.5201120172023
Reported (through 2023)

Generating units

12 of 12 shown · 1,918 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 3327.6SubbituminousConventional Steam Coal1959Operating
Unit 4327.6SubbituminousConventional Steam Coal1959Operating
Unit 1300.0Bituminous coalConventional Steam Coal1956Operating
Unit 2300.0SubbituminousConventional Steam Coal1957Operating
Unit GT584.5Natural GasNatural Gas Fired Combustion Turbine2000Operating
Unit GT684.5Natural GasNatural Gas Fired Combustion Turbine2000Operating
Unit GT784.5Natural GasNatural Gas Fired Combustion Turbine2000Operating
Unit GT884.5Natural GasNatural Gas Fired Combustion Turbine2000Operating
Unit GT181.3Natural GasNatural Gas Fired Combustion Turbine1975Operating
Unit GT281.3Natural GasNatural Gas Fired Combustion Turbine1975Operating
Unit GT381.3Natural GasNatural Gas Fired Combustion Turbine1975Operating
Unit GT481.3Natural GasNatural Gas Fired Combustion Turbine1975Operating

All 12 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.

See the engineering record →
UnitEventWhenMW
Unit 1retirement2031-12300 MW
Unit 2retirement2031-12300 MW
Unit 3retirement2031-12328 MW
Unit 4retirement2031-12328 MW
Unit GT1retirement2031-1281.3 MW
Unit GT2retirement2031-1281.3 MW
Unit GT3retirement2031-1281.3 MW
Unit GT4retirement2031-1281.3 MW
Unit GT5retirement2031-1284.5 MW
Unit GT6retirement2031-1284.5 MW
Unit GT7retirement2031-1284.5 MW
Unit GT8retirement2031-1284.5 MW

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
US Government
Operating utility
Tennessee Valley Authority
Entity type
Federally Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1007790
Balancing authority
TVA
NERC region
SERC
Gas pipeline
Columbia Gulf Transmission
EIA plant ID
3403

Common questions

How big is Gallatin?
1,918 MW across 12 generating units in service — 1,255 MW of coal and 663 MW of natural gas.
Who owns and operates it?
Owned by US Government and operated by Tennessee Valley Authority, filed as federally owned utility.
Which grid does it sell into?
TVA (Tennessee Valley Authority) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1968. The oldest operating unit is Unit 1 (1956); the newest are Unit GT5, Unit GT6, Unit GT7 and Unit GT8 (2000).
When is it due to retire?
Planned retirement dates are filed for 12 of 12 operating units: Unit 1 (2031), Unit 2 (2031), Unit 3 (2031), Unit 4 (2031), Unit GT1 (2031), Unit GT2 (2031), Unit GT3 (2031) and Unit GT4 (2031) and others.
What does it burn, and where does the fuel come from?
In 2023 it burned coal and natural gas.
How much does it spend on fuel?
An estimated $152M in 2023 — coal $147M, natural gas $2.08M and oil & petroleum $2.85M. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
4.21 Mt in 2023, reported to the EPA — the 91st highest of 6,030 US facilities that reported. Down from 7.25 Mt in 2011.

Related pages

Tennessee energyAll facilities in the state→Watts Bar Nuclear Plant2,540 MW operating capacity→ Sequoyah2,441 MW operating capacity→ Allen1,792 MW operating capacity→ Raccoon Mountain1,714 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming