Esmeralda County, Nevada · NEVP · operated by Fish Lake Geothermal LLC
Capacity shown is planned or not in service
A planned 26.5 MW geothermal project, filed to come online in 2026.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit FL5 | 9.0 | Geothermal | Geothermal | 2026 | Proposed |
| Unit FL4 | 6.2 | Geothermal | Geothermal | 2026 | Proposed |
| Unit FL3 | 4.7 | Geothermal | Geothermal | 2026 | Proposed |
| Unit FL1 | 3.3 | Geothermal | Geothermal | 2026 | Proposed |
| Unit FL2 | 3.3 | Geothermal | Geothermal | 2026 | Proposed |
All 5 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit FL1 | new unit | 2026 | 3.3 MW |
| Unit FL2 | new unit | 2026 | 3.3 MW |
| Unit FL3 | new unit | 2026 | 4.7 MW |
| Unit FL4 | new unit | 2026 | 6.2 MW |
| Unit FL5 | new unit | 2026 | 9.0 MW |