Lincoln County, Nevada · NEVP · operated by Escape Solar LLC
Capacity shown is planned or not in service
A planned 285 MW solar photovoltaic project, filed to come online in 2025.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit ESPH2 | 115.0 | Solar | Solar Photovoltaic | 2025 | Proposed |
| Unit ESPHB | 100.0 | Storage | Batteries | 2025 | Proposed |
| Unit ESPH1 | 70.0 | Solar | Solar Photovoltaic | 2025 | Proposed |
All 3 units shown. Behind each one, AEA holds the full engineering record: ownership stakes where a unit is jointly held.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit ESPH1 | new unit | 2025 | 70.0 MW |
| Unit ESPH2 | new unit | 2025 | 115 MW |
| Unit ESPHB | new unit | 2025 | 100 MW |