Alameda County, California · CAISO · operated by AES Distributed Energy
Retired — its last generating unit went out of service in 2015, ending 1.2 MW of capacity.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit GEN1 | 1.2 | Wind | Onshore Wind Turbine | 1981 | Retired 2015 |
1 unit shown. Behind it, AEA holds the full engineering record: ownership stakes where a unit is jointly held.
See the engineering record →