Fairbanks North Star, Alaska · operated by U S Air Force-Eielson AFB
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit TG5 | 10.0 | Subbituminous | Conventional Steam Coal | 1987 | Operating |
| Unit TG6 | 10.0 | Subbituminous | Conventional Steam Coal | 2025 | Operating |
| Unit TG3 | 5.0 | Subbituminous | Conventional Steam Coal | 1955 | Operating |
| Unit TG4 | 5.0 | Subbituminous | Conventional Steam Coal | 1969 | Operating |
| Unit DG01 | 1.5 | Distillate oil | Petroleum Liquids | 1998 | Standby |
| Unit DG02 | 1.5 | Distillate oil | Petroleum Liquids | 1998 | Standby |
| Unit DG03 | 1.5 | Distillate oil | Petroleum Liquids | 1998 | Standby |
| Unit DG04 | 1.5 | Distillate oil | Petroleum Liquids | 1998 | Standby |
| Unit TG1 | 2.5 | Subbituminous | Conventional Steam Coal | 1952 | Retired 2022 |
| Unit TG2 | 2.5 | Subbituminous | Conventional Steam Coal | 1952 | Retired 2022 |
All 10 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years.
See the engineering record →