Chena Power Plant

Fairbanks, Fairbanks North Star Borough, Alaska · operated by Aurora Energy LLC · owned by Aurora Energy LLC

2023 · headline year
Capacity in service27.5MW3 units · coal
Net generation143GWh2023 · reported
CO₂ emitted265,496t2023 · reported to EPA · 1,321st highest of 6,030 in the US
Rank in Alaska#19of 142 · by capacity · #4,132 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor60%2023

Location

Fairbanks North Star Borough

What it burns

2023 · reported

Share of reported fuel consumption

100% Coal · 2.69 TBtu · reported

CO₂ emitted, t · 2011–2023

0200,000400,000600,000201120172023
Reported (through 2023)

Generating units

5 of 5 shown · 27.5 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 520.0SubbituminousConventional Steam Coal1975Operating
Unit 15.0SubbituminousConventional Steam Coal1952Operating
Unit 22.5SubbituminousConventional Steam Coal1952Operating
Unit 31.5SubbituminousConventional Steam Coal1952Retired 2009
Unit 72.3SubbituminousConventional Steam Coalnot reportedCanceled

All 5 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Aurora Energy LLC · 100%
Operating utility
Aurora Energy LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Industry sector
Power Plants
EPA facility ID
1004719
EIA plant ID
79

Common questions

How big is Chena Power Plant?
27.5 MW across 3 generating units in service. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Aurora Energy LLC (100%) and operated by Aurora Energy LLC, filed as independent power producer.
How old is it?
The capacity-weighted average megawatt here came online in 1969. The oldest operating units are Unit 1 and Unit 2 (1952); the newest is Unit 5 (1975).
When is it due to retire?
No retirement date has been filed for any operating unit at Chena Power Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned coal.
How much CO₂ does it emit?
265,496 t in 2023, reported to the EPA — the 1,321st highest of 6,030 US facilities that reported. Down from 350,029 t in 2011.

Related pages

Alaska energyAll facilities in the state→Terror Lake Microgrid33.6 MW operating capacity→ Eielson AFB Central Heat & Power Plant30.0 MW operating capacity→ S W Bailey25.9 MW operating capacity→ Jarvis Street25.6 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming