Los Angeles County, California · LDWP · operated by California State University, Northridge
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit B2PV | 0.4 | Solar | Solar Photovoltaic | 2005 | Operating |
| Unit E6PV | 0.2 | Solar | Solar Photovoltaic | 2003 | Operating |
| Unit G6PV | 0.8 | Solar | Solar Photovoltaic | 2025 | Proposed |
| Unit 63 | 0.3 | Natural Gas | Other Natural Gas | 2007 | Retired 2018 |
| Unit 64 | 0.3 | Natural Gas | Other Natural Gas | 2007 | Retired 2018 |
| Unit 65 | 0.3 | Natural Gas | Other Natural Gas | 2007 | Retired 2018 |
| Unit 67 | 0.3 | Natural Gas | Other Natural Gas | 2007 | Retired 2018 |
| Unit CP1 | 0.2 | Natural Gas | Natural Gas Fired Combustion Turbine | 2001 | Retired 2018 |
All 8 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit G6PV | new unit | 2025 | 0.8 MW |
| Unit B2PV | repowering | 2026-08 | 0.4 MW |
| Unit E6PV | repowering | 2026-08 | 0.2 MW |