AMERICAN ENERGY ATLAS
Power·Mississippi

Columbus MS

Lowndes County, Mississippi · TVA · operated by International Paper Columbus Mill

2023 · headline year
Capacity in service125MW3 units · biomass · 1 more on standby or out of service
Net generation536GWh2023 · reported
Rank in Mississippi#25of 59 · by capacity · #2,086 of 13,147 US
Reported suppliersNot reported2023

Location

Lowndes County · TVA · SERC

What it burns

2023 · reported

Share of reported fuel consumption

91% Black liquor · 15.4 TBtu · reported9% Natural gas · 1.46 TBtu · reported

Black liquor supplies 91% of the fuel energy it burned in 2023.

Reported fuel consumption, TBtu · 2011–2023

0102030201120172023
Reported (through 2023)

Generating units

4 of 4 shown · 125 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit TG164.0Black liquorWood/Wood Waste Biomass1990Operating
Unit TG246.0Black liquorWood/Wood Waste Biomass1982Operating
Unit TG314.6Black liquorWood/Wood Waste Biomass1982Operating
Unit TG44.0Black liquorWood/Wood Waste Biomass1987Standby

All 4 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
International Paper Columbus Mill
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
TVA
NERC region
SERC
EIA plant ID
50184

Common questions

How big is Columbus MS?
125 MW across 3 generating units in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by International Paper Columbus Mill, filed as independent power producer.
Which grid does it sell into?
TVA (Tennessee Valley Authority) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1986. The oldest operating units are Unit TG2 and Unit TG3 (1982); the newest is Unit TG1 (1990).
When is it due to retire?
No retirement date has been filed for any operating unit at Columbus MS. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned black liquor and natural gas.

Related pages

Mississippi energyAll facilities in the state→Chevron Cogenerating Station170 MW operating capacity→ Sylvarena Generating Plant141 MW operating capacity→ Delta's Edge Solar100 MW operating capacity→ Ragsdale Solar LLC100 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming