Clewiston, Hendry County, Florida · FPC · operated by United States Sugar Corp · owned by US Sugar Corp
2023 · headline year
Capacity in service49.0MW3 units · biomass
Net generation270GWh2023 · reported
CO₂ emitted41,832t2023 · reported to EPA · 4,032nd highest of 6,030 in the US
Rank in Florida#219of 310 · by capacity · #3,568 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor63%2023
Location
What its on-site power plant burns
2023 · reported
Share of reported fuel consumption
100% Biomass · 17.3 TBtu · reported
CO₂ emitted, t · 2011–2023
Reported (through 2023)
Generating units
10 of 10 shown · 49.0 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit TG7
20.0
Agricultural byproducts
Other Waste Biomass
2006
Operating
Unit TG6
15.0
Agricultural byproducts
Other Waste Biomass
2004
Operating
Unit TG8
14.0
Agricultural byproducts
Other Waste Biomass
2007
Operating
Unit TG5
21.6
Agricultural byproducts
Other Waste Biomass
1997
Retired 2017
Unit TG4
6.0
Agricultural byproducts
Other Waste Biomass
1983
Retired 2007
Unit TG1
5.0
Agricultural byproducts
Other Waste Biomass
1978
Retired 2004
Unit TG2
3.5
Agricultural byproducts
Other Waste Biomass
1945
Retired 2004
Unit TG3
3.1
Agricultural byproducts
Other Waste Biomass
1981
Retired 2007
Unit DGN
1.0
Distillate oil
Petroleum Liquids
1987
Retired 2006
Unit DGS
1.0
Distillate oil
Petroleum Liquids
1987
Retired 2006
All 10 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; stack height.
49.0 MW across 3 generating units in service. A further 7 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by US Sugar Corp (100%) and operated by United States Sugar Corp, filed as industrial.
Which grid does it sell into?
FPC (Progress Energy Florida) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2006. The oldest operating unit is Unit TG6 (2004); the newest is Unit TG8 (2007).
When is it due to retire?
No retirement date has been filed for any operating unit at Clewiston Sugar House. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned biomass.
How much CO₂ does it emit?
41,832 t in 2023, reported to the EPA — the 4,032nd highest of 6,030 US facilities that reported. Up from 31,332 t in 2011.