Fuel spend$425,3742023 · estimate
Capacity in service44.0MW3 units · gas + oil
Net generation10.9GWh2023 · reported
CO₂ emitted7,494t2023 · reported to EPA · 5,832nd highest of 6,030 in the US
Rank in Kansas#70 (tied)of 173 · by capacity · #3,676 (tied) of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2011
Capacity factor3%2023
All 4 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.
See the engineering record →
How big is City of Coffeyville Light & Power?
44.0 MW across 3 generating units in service — 40.0 MW of natural gas and 4.0 MW of oil. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Which grid does it sell into?
SPP (Southwest Power Pool) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 1976. The oldest operating unit is Unit 7 (1973); the newest are Unit 1 and Unit 2 (2007).
When is it due to retire?
No retirement date has been filed for any operating unit at City of Coffeyville Light & Power. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $425,374 in 2023 — natural gas $424,304 and oil & petroleum $1,069. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
7,494 t in 2023, reported to the EPA — the 5,832nd highest of 6,030 US facilities that reported. Up from 1,740 t in 2011.