Fuel spend$1.79M2023 · estimate
Capacity in service50.0MW1 unit · gas · 1 more on standby or out of service
Net generation25.8GWh2023 · reported
CO₂ emitted31,024t2023 · reported to EPA · 4,669th highest of 6,030 in the US
Rank in Kansas#68 (tied)of 173 · by capacity · #3,450 (tied) of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2011
All 2 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.
See the engineering record →
How big is Cimarron River?
50.0 MW across 1 generating unit in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Which grid does it sell into?
SPP (Southwest Power Pool) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 1963.
When is it due to retire?
No retirement date has been filed for any operating unit at Cimarron River. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
Its generating units are fuelled by natural gas.
How much does it spend on fuel?
An estimated $1.79M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
31,024 t in 2023, reported to the EPA — the 4,669th highest of 6,030 US facilities that reported. Down from 66,035 t in 2011.