CI Power Cogeneration Plant

Camarillo, Ventura County, California · CAISO · operated by CSUCI Site Authority · owned by Csu Trustees & Csuci Site Authority

2023 · headline year
Fuel spend$364,7552023 · estimate
Capacity in service31.1MW2 units · gas
Net generation482MWh2023 · reported
CO₂ emitted2,328t2023 · reported to EPA · 5,941st highest of 6,030 in the US
Rank in California#498of 1,713 · by capacity · #3,987 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor0%2023

Location

Ventura County · CAISO · WECC

What its on-site power plant burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 5,199 MMBtu · reported · $364,755 est.

CO₂ emitted, t · 2011–2023

050,000100,000150,000201120172023
Reported (through 2023)

Generating units

2 of 2 shown · 31.1 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN123.5Natural GasNatural Gas Fired Combined Cycle1988Operating
Unit GEN27.6Natural GasNatural Gas Fired Combined Cycle1988Operating

All 2 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
CSUCI Site Authority
Entity type
State-Owned Utility
Regulatory status
Not Regulated
Industry sector
Other
EPA facility ID
1001667
Balancing authority
CAISO
NERC region
WECC
EIA plant ID
50851

Common questions

How big is CI Power Cogeneration Plant?
31.1 MW across 2 generating units in service.
Who owns and operates it?
Owned by Csu Trustees & Csuci Site Authority (100%) and operated by CSUCI Site Authority, filed as state-owned utility.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1988. Every operating unit came online in 1988.
When is it due to retire?
No retirement date has been filed for any operating unit at CI Power Cogeneration Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned natural gas.
How much does it spend on fuel?
An estimated $364,755 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
2,328 t in 2023, reported to the EPA — the 5,941st highest of 6,030 US facilities that reported. Down from 106,233 t in 2011.

Related pages

California energyAll facilities in the state→Air Products Wilmington Hydrogen Plant31.9 MW operating capacity→ Cymric31.2 MW operating capacity→ Balch 131.0 MW operating capacity→ Burney Forest Products31.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming