AMERICAN ENERGY ATLAS
Power·Virginia

Church Street Plant

Prince William County, Virginia · PJM · operated by City of Manassas - (VA)

2023 · headline year
Capacity in service4.3MW3 units · oil
Net generation142MWh2023 · reported
Rank in Virginia#185 (tied)of 230 · by capacity · #7,945 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor0%2023

Location

Prince William County · PJM · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Oil & petroleum · 29 MMBtu · reported

Reported fuel consumption, MMBtu · 2011–2023

02,0004,0006,000201120172023
Reported (through 2023)

Generating units

6 of 6 shown · 4.3 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit C51.6Distillate oilPetroleum Liquids1987Operating
Unit C61.6Distillate oilPetroleum Liquids1987Operating
Unit C3A1.1Distillate oilPetroleum Liquids1996Operating
Unit C11.0Distillate oilPetroleum Liquids1979Retired 2018
Unit C21.0Distillate oilPetroleum Liquids1979Retired 2018
Unit C41.0Distillate oilPetroleum Liquids1979Retired 2018

All 6 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
City of Manassas - (VA)
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Balancing authority
PJM
NERC region
SERC
EIA plant ID
7438

Common questions

How big is Church Street Plant?
4.3 MW across 3 generating units in service. A further 3 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by City of Manassas - (VA), filed as municipally owned utility.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1989. The oldest operating units are Unit C5 and Unit C6 (1987); the newest is Unit C3A (1996).
When is it due to retire?
No retirement date has been filed for any operating unit at Church Street Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned oil & petroleum.

Related pages

Virginia energyAll facilities in the state→Orange Street G14.8 MW operating capacity→ Schoolfield Dam4.5 MW operating capacity→ NASA Wallops Flight Facility Solar4.3 MW operating capacity→ Prince Edward CSG LLC4.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming