Capacity in service4.8MW4 units · biomass
Rank in Florida#274 (tied)of 310 · by capacity · #7,658 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

Miami Dade County · FPL · SERC

Reported fuel consumption, MMBtu · 2011–19

0100,000200,000300,000201120152019
Reported (through 2019)

Generating units

8 of 8 shown · 4.8 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 3A1.2BiogasOther Waste Biomass2013Operating
Unit 4A1.2BiogasOther Waste Biomass2013Operating
Unit 51.2BiogasOther Waste Biomass2015Operating
Unit 61.2BiogasOther Waste Biomass2015Operating
Unit 11.2BiogasOther Waste Biomass1989Retired 2014
Unit 21.2BiogasOther Waste Biomass1989Retired 2014
Unit 31.2BiogasOther Waste Biomass1989Retired 2012
Unit 41.2BiogasOther Waste Biomass1989Retired 2012

All 8 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Miami Dade Water & Sewer Dept
Entity type
Municipally Owned Utility
Regulatory status
Not Regulated
Balancing authority
FPL
NERC region
SERC
EIA plant ID
54623

Common questions

How big is Central District Wastewater Treat Plant?
4.8 MW across 4 generating units in service. A further 4 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Miami Dade Water & Sewer Dept, filed as municipally owned utility.
Which grid does it sell into?
FPL (Florida Power & Light Company) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2014. The oldest operating units are Unit 3A and Unit 4A (2013); the newest are Unit 5 and Unit 6 (2015).
When is it due to retire?
No retirement date has been filed for any operating unit at Central District Wastewater Treat Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
Its generating units are fuelled by biogas.

Related pages

Florida energyAll facilities in the state→Springhill Regional Landfill4.8 MW operating capacity→ ACE-Stanton PV4.8 MW operating capacity→ Seminole Energy4.8 MW operating capacity→ Cutrale Citrus Juices USA, Inc.4.1 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming