AMERICAN ENERGY ATLAS
Power·Michigan

Cadillac Renewable Energy

Wexford County, Michigan · MISO · operated by Cadillac Renewable Energy LLC

2023 · headline year
Capacity in service44.0MW1 unit · biomass
Net generation131GWh2023 · reported
Rank in Michigan#79of 258 · by capacity · #3,676 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor34%2023

Location

Wexford County · MISO · RFC

What it burns

2023 · reported

Share of reported fuel consumption

100% Biomass · 2.76 TBtu · reported

Reported fuel consumption, TBtu · 2011–2023

0246201120172023
Reported (through 2023)

Generating units

2 of 2 shown · 44.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN244.0WoodWood/Wood Waste Biomass2020Operating
Unit GEN144.0WoodWood/Wood Waste Biomass1993Retired 2020

All 2 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Cadillac Renewable Energy LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
MISO
NERC region
ReliabilityFirst (RFC)
EIA plant ID
54415

Common questions

How big is Cadillac Renewable Energy?
44.0 MW across 1 generating unit in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Cadillac Renewable Energy LLC, filed as independent power producer.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 2020.
When is it due to retire?
No retirement date has been filed for any operating unit at Cadillac Renewable Energy. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned biomass.

Related pages

Michigan energyAll facilities in the state→University of Michigan47.5 MW operating capacity→ Alpena Cement Plant47.2 MW operating capacity→ Edison Sault41.8 MW operating capacity→ Genesee Power Station LP39.5 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming