Petroleum coke supplies 84% of the fuel energy it burned in 2023.
Reported fuel consumption, TBtu · 2011–2023
Reported (through 2023)
Generating units
5 of 5 shown · 47.2 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit GEN6
12.0
Petroleum coke
Petroleum Coke
1952
Operating
Unit GEN8
11.0
Petroleum coke
Petroleum Coke
1991
Operating
Unit GEN9
11.0
Petroleum coke
Petroleum Coke
1994
Operating
Unit GEN7
10.0
Petroleum coke
Petroleum Coke
1955
Operating
Unit GE10
3.2
Petroleum coke
Petroleum Coke
1999
Operating
All 5 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years.
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 1975. The oldest operating unit is Unit GEN6 (1952); the newest is Unit GE10 (1999).
When is it due to retire?
No retirement date has been filed for any operating unit at Alpena Cement Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?