Haskell County, Texas · ERCOT · operated by Briggs Solar, LLC
Capacity shown is planned or not in service
A planned 376 MW solar photovoltaic project, filed to come online in 2027.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit BRIGG | 305.0 | Solar | Solar Photovoltaic | 2027 | Proposed |
| Unit BRUGG | 70.5 | Storage | Batteries | 2027 | Proposed |
All 2 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit BRIGG | new unit | 2027 | 305 MW |
| Unit BRUGG | new unit | 2027 | 70.5 MW |