Power·Texas
Brazos River BESS LLC
Brazoria County, Texas · ERCOT · operated by Nexus Renewables U.S. Inc.
Capacity shown is planned or not in service
Proposed
A planned 180 MW batteries project, filed to come online in 2026.
Planned capacity180MW1 unit · not yet in service
Location
Generating units
1 of 1 shown · none in service
1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →
Ownership & operations
- Operating utility
- Nexus Renewables U.S. Inc.
- Entity type
- Independent Power Producer
- Regulatory status
- Not Regulated
- Balancing authority
- ERCOT
- NERC region
- Texas RE (TRE)
- EIA plant ID
- 68814
Common questions
How big is Brazos River BESS LLC?
180 MW across 1 unit, none of which is in service — all planned.
Who owns and operates it?
Operated by Nexus Renewables U.S. Inc., filed as independent power producer.
Which grid does it sell into?
ERCOT (Electric Reliability Council of Texas, Inc.) is its balancing authority, inside NERC's Texas RE region.
What does it run on?
Batteries (180 MW).
Related pages
Select a state