Bountiful City

Davis County, Utah · PACE · operated by City of Bountiful

2023 · headline year
Fuel spend$1.95M2023 · estimate
Capacity in service30.4MW3 units · gas
Net generation21.4GWh2023 · reported
Rank in Utah#47 (tied)of 123 · by capacity · #4,004 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor8%2023

Location

Davis County · PACE · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 244,351 MMBtu · reported · $1.95M est.

Reported fuel consumption, MMBtu · 2011–2023

0200,000400,000600,000201120172023
Reported (through 2023)

Generating units

10 of 10 shown · 30.4 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 2A12.6Natural GasNatural Gas Fired Combustion Turbine2012Operating
Unit 3A12.6Natural GasNatural Gas Fired Combustion Turbine2012Operating
Unit 1A5.2Natural GasNatural Gas Fired Combustion Turbine2001Operating
Unit IC87.0Natural GasNatural Gas Internal Combustion Engine1986Retired 2014
Unit 62.5Natural GasNatural Gas Internal Combustion Engine1962Retired 2011
Unit 21.2Natural GasNatural Gas Internal Combustion Engine1959Retired 2011
Unit 31.2Natural GasNatural Gas Internal Combustion Engine1959Retired 2011
Unit 41.0Natural GasNatural Gas Internal Combustion Engine1955Retired 2011
Unit 51.0Natural GasNatural Gas Internal Combustion Engine1957Retired 2011
Unit 70.1Distillate oilPetroleum Liquids1936Retired 2011

All 10 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
City of Bountiful
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Balancing authority
PACE
NERC region
WECC
EIA plant ID
3665

Common questions

How big is Bountiful City?
30.4 MW across 3 generating units in service. A further 7 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by City of Bountiful, filed as municipally owned utility.
Which grid does it sell into?
PACE (PacifiCorp - East) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2010. The oldest operating unit is Unit 1A (2001); the newest are Unit 2A and Unit 3A (2012).
When is it due to retire?
No retirement date has been filed for any operating unit at Bountiful City. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $1.95M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Utah energyAll facilities in the state→Blundell38.1 MW operating capacity→ US Magnesium LLC32.0 MW operating capacity→ Tesoro SLC Cogeneration Plant30.4 MW operating capacity→ Cutler Hydro30.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming