AMERICAN ENERGY ATLAS
Power·Utah

Blundell

Beaver County, Utah · PACE · operated by PacifiCorp

2023 · headline year
Fuel spend$02023 · no purchased fuel
Capacity in service38.1MW2 units · geothermal
Rank in Utah#45of 123 · by capacity · #3,830 (tied) of 13,147 US

Location

Beaver County · PACE · WECC

Generating units

3 of 3 shown · 38.1 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 126.1GeothermalGeothermal1984Operating
Unit 212.0GeothermalGeothermal2007Operating
Unit 330.0GeothermalGeothermalnot reportedCanceled

All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
PacifiCorp
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Balancing authority
PACE
NERC region
WECC
EIA plant ID
299

Common questions

How big is Blundell?
38.1 MW across 2 generating units in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by PacifiCorp, filed as investor-owned utility.
Which grid does it sell into?
PACE (PacifiCorp - East) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1991. The oldest operating unit is Unit 1 (1984); the newest is Unit 2 (2007).
When is it due to retire?
No retirement date has been filed for any operating unit at Blundell. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Geothermal (38.1 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (geothermal) burn no fuel, and it reports no fuel consumption to the EIA.

Related pages

Utah energyAll facilities in the state→Castle Solar, LLC40.0 MW operating capacity→ Kennecott Utah Copper, LLC38.2 MW operating capacity→ US Magnesium LLC32.0 MW operating capacity→ Bountiful City30.4 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming