Stillwater County, Montana · NWMT · operated by Puget Sound Energy Inc
Capacity shown is planned or not in service
A planned 248 MW onshore wind turbine project, filed to come online in 2025.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit BCW1 | 62.0 | Wind | Onshore Wind Turbine | 2025 | Proposed |
| Unit BCW2 | 62.0 | Wind | Onshore Wind Turbine | 2025 | Proposed |
| Unit BCW3 | 62.0 | Wind | Onshore Wind Turbine | 2025 | Proposed |
| Unit BCW4 | 62.0 | Wind | Onshore Wind Turbine | 2025 | Proposed |
| Unit BCW1B | 30.0 | Storage | Batteries | not reported | Canceled |
| Unit BCW4B | 30.0 | Storage | Batteries | not reported | Canceled |
| Unit BCW2B | 20.0 | Storage | Batteries | not reported | Canceled |
| Unit BCW3B | 20.0 | Storage | Batteries | not reported | Canceled |
All 8 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit BCW1 | new unit | 2025 | 62.0 MW |
| Unit BCW2 | new unit | 2025 | 62.0 MW |
| Unit BCW3 | new unit | 2025 | 62.0 MW |
| Unit BCW4 | new unit | 2025 | 62.0 MW |