Beaverhead County, Montana · NWMT · operated by ARFL bn, LLC
Capacity shown is planned or not in service
A planned 400 MW solar photovoltaic project, filed to come online in 2027.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit ARFL1 | 200.0 | Solar | Solar Photovoltaic | 2027 | Proposed |
| Unit ARFL2 | 200.0 | Storage | Batteries | 2027 | Proposed |
All 2 units shown. Behind each one, AEA holds the full engineering record: ownership stakes where a unit is jointly held.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit ARFL1 | new unit | 2027 | 200 MW |
| Unit ARFL2 | new unit | 2027 | 200 MW |