Baptist Medical Center

Duval County, Florida · JEA · operated by Baptist Memorial Hospital

2023 · headline year
Fuel spend$2.08M2023 · estimate
Capacity in service9.0MW3 units · gas
Net generation20.4GWh2023 · reported
Rank in Florida#256of 310 · by capacity · #5,746 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor26%2023

Location

Duval County · JEA · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 298,694 MMBtu · reported · $2.08M est.

Reported fuel consumption, MMBtu · 2011–2023

0200,000400,000600,000201120172023
Reported (through 2023)

Generating units

7 of 7 shown · 9.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit TG-43.5Natural GasNatural Gas Fired Combustion Turbine1993Operating
Unit TG-33.0Natural GasNatural Gas Fired Combustion Turbine1986Operating
Unit TG-22.5Natural GasNatural Gas Fired Combustion Turbine1983Operating
Unit TG-12.6Natural GasNatural Gas Fired Combustion Turbine1982Retired 2007
Unit CG-10.5Natural GasNatural Gas Internal Combustion Engine1973Retired 2005
Unit CG-30.5Natural GasNatural Gas Internal Combustion Engine1972Retired 2007
Unit CG-40.5Natural GasNatural Gas Internal Combustion Engine1973Retired 2006

All 7 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Baptist Memorial Hospital
Entity type
Commercial
Regulatory status
Not Regulated
Balancing authority
JEA
NERC region
SERC
EIA plant ID
10008

Common questions

How big is Baptist Medical Center?
9.0 MW across 3 generating units in service. A further 4 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Baptist Memorial Hospital, filed as commercial.
Which grid does it sell into?
JEA is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1988. The oldest operating unit is Unit TG-2 (1983); the newest is Unit TG-4 (1993).
When is it due to retire?
No retirement date has been filed for any operating unit at Baptist Medical Center. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $2.08M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Florida energyAll facilities in the state→JED Solid Waste Mgmt Renewable Energy9.6 MW operating capacity→ Trail Ridge Landfill Gas Recovery9.6 MW operating capacity→ Suwannee Solar Facility8.8 MW operating capacity→ Anheuser-Busch LLC8.7 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming