AMERICAN ENERGY ATLAS
Industrial + power·Florida

Anheuser-Busch LLC

Jacksonville, Duval County, Florida · JEA · operated by Anheuser-Busch Inc · owned by Anheuser-Busch Cos LLC

2023 · headline year
Fuel spend$6.85M2023 · estimate
Capacity in service8.7MW1 unit · gas
Net generation69.5GWh2023 · reported
CO₂ emitted52,175t2023 · reported to EPA · 3,606th highest of 6,030 in the US
Rank in Florida#258of 310 · by capacity · #5,833 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor91%2023

Location

Duval County · JEA · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 857,877 MMBtu · reported · $6.85M est.

CO₂ emitted, t · 2011–2023

025,00050,00075,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 8.7 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN18.7Natural GasNatural Gas Fired Combustion Turbine1987Operating

1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Anheuser-Busch Cos LLC · 100%
Operating utility
Anheuser-Busch Inc
Entity type
Industrial
Regulatory status
Not Regulated
Industry sector
Other, Suppliers of CO2
EPA facility ID
1006147
Balancing authority
JEA
NERC region
SERC
Gas pipeline
Florida Gas Transmission Company
EIA plant ID
10431

Common questions

How big is Anheuser-Busch LLC?
8.7 MW across 1 generating unit in service.
Who owns and operates it?
Owned by Anheuser-Busch Cos LLC (100%) and operated by Anheuser-Busch Inc, filed as industrial.
Which grid does it sell into?
JEA is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1987.
When is it due to retire?
No retirement date has been filed for any operating unit at Anheuser-Busch LLC. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $6.85M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
52,175 t in 2023, reported to the EPA — the 3,606th highest of 6,030 US facilities that reported. Down from 60,739 t in 2011.

Related pages

Florida energyAll facilities in the state→Baptist Medical Center9.0 MW operating capacity→ Suwannee Solar Facility8.8 MW operating capacity→ Micanopy Energy Storage Facility8.3 MW operating capacity→ Cutrale Citrus Juices USA, Inc.8.2 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming