Capacity in service225MW2 units · solar + storage · incl. 225 MW online after 2023
Rank in California#108of 1,713 · by capacity · #1,303 (tied) of 13,147 US
All 2 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases.
See the engineering record →
How big is Baldy Mesa Solar & Storage?
225 MW across 2 generating units in service — 150 MW of solar and 75.0 MW of storage.
Who owns and operates it?
Operated by AES Clean Energy, filed as independent power producer.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2024. Every operating unit came online in 2024.
When is it due to retire?
No retirement date has been filed for any operating unit at Baldy Mesa Solar & Storage. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (150 MW) and Batteries (75.0 MW).