Modesto, Stanislaus County, California · TIDC · operated by Turlock Irrigation District · owned by Turlock Irrigation District Employees Assoc
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit 2 | 58.0 | Natural Gas | Natural Gas Fired Combustion Turbine | 2012 | Operating |
| Unit 3 | 58.0 | Natural Gas | Natural Gas Fired Combustion Turbine | 2012 | Operating |
| Unit 4 | 58.0 | Natural Gas | Natural Gas Fired Combustion Turbine | 2012 | Operating |
| Unit 1 | 49.5 | Natural Gas | Natural Gas Fired Combustion Turbine | 1996 | Operating |
All 4 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →| Supplier | Fuel | Delivered TBtu | Tons | Mine of origin | Transport |
|---|---|---|---|---|---|
| EDF Trading | Natural gas | 2.02 | n/a | n/a | Pipeline |
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
The supplier is shown. Subscribe to see every one of the 258 deliveries recorded 2012–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
See the delivery history →