AMERICAN ENERGY ATLAS
Industrial + power·Arizona

Arizona State University

Tempe, Maricopa County, Arizona · AZPS · operated by Energy Center Phoenix LLC · owned by Arizona State University

2023 · headline year
Fuel spend$8.15M2023 · estimate
Capacity in service17.1MW2 units · gas
Net generation41.3GWh2023 · reported
CO₂ emitted63,883t2023 · reported to EPA for the whole site, which is larger than the plant shown here · 3,215th highest of 6,030 in the US
Rank in Arizona#104of 166 · by capacity · #4,800 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor28%2023

Location

Maricopa County · AZPS · WECC

What its on-site power plant burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 524,607 MMBtu · reported · $8.15M est.

CO₂ emitted, t · 2011–2023

025,00050,00075,000201120172023
Reported (through 2023)

Generating units

2 of 2 shown · 17.1 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit G19.2Natural GasNatural Gas Fired Combined Cycle2006Operating
Unit G27.9Natural GasNatural Gas Fired Combustion Turbine2019Operating

All 2 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Arizona State University · 100%
Operating utility
Energy Center Phoenix LLC
Entity type
State-Owned Utility
Regulatory status
Not Regulated
Industry sector
Other
EPA facility ID
1006199
Balancing authority
AZPS
NERC region
WECC
EIA plant ID
58199

Common questions

How big is Arizona State University?
17.1 MW across 2 generating units in service.
Who owns and operates it?
Owned by Arizona State University (100%) and operated by Energy Center Phoenix LLC, filed as state-owned utility.
Which grid does it sell into?
AZPS (Arizona Public Service Company) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2012. The oldest operating unit is Unit G1 (2006); the newest is Unit G2 (2019).
When is it due to retire?
No retirement date has been filed for any operating unit at Arizona State University. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned natural gas.
How much does it spend on fuel?
An estimated $8.15M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
63,883 t in 2023, reported to the EPA — the 3,215th highest of 6,030 US facilities that reported. Up from 42,020 t in 2011.

Also at this site

AZ State University - Tempe Campus SolarSame site · operating→

Related pages

Arizona energyAll facilities in the state→Queen Creek Solar Farm19.0 MW operating capacity→ Fort Huachuca Solar PV Project17.7 MW operating capacity→ Avalon Solar II16.0 MW operating capacity→ RE Gillespie 1 LLC15.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming