Red Rock, Pinal County, Arizona · AZPS · operated by Arizona Public Service Co · owned by Pinnacle West Capital Corp
2023 · headline year
Fuel spend$9.91M2023 · estimate
Capacity in service184MW3 units · gas
Net generation176GWh2023 · reported
CO₂ emitted127,427t2023 · reported to EPA · 2,047th highest of 6,030 in the US
Rank in Arizona#39of 166 · by capacity · #1,594 (tied) of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2013
Capacity factor11%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 2.41 TBtu · reported · $9.91M est.
CO₂ emitted, t · 2011–2023
Reported (through 2023)
Generating units
6 of 6 shown · 184 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit GE1
78.3
Natural Gas
Natural Gas Fired Combustion Turbine
2002
Operating
Unit GT1
53.1
Natural Gas
Natural Gas Fired Combustion Turbine
1972
Operating
Unit GT2
53.1
Natural Gas
Natural Gas Fired Combustion Turbine
1973
Operating
Unit 1
125.0
Natural Gas
Natural Gas Steam Turbine
1954
Retired 2013
Unit 2
125.0
Natural Gas
Natural Gas Steam Turbine
1955
Retired 2013
Unit PV1
1.0
Solar
Solar Thermal without Energy Storage
2005
Retired 2013
All 6 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
El Paso Natural Gas Company LLC, Transwestern Pipeline Company
EIA plant ID
118
Common questions
How big is APS Saguaro Power Plant?
184 MW across 3 generating units in service. A further 3 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Pinnacle West Capital Corp (100%) and operated by Arizona Public Service Co, filed as investor-owned utility.
Which grid does it sell into?
AZPS (Arizona Public Service Company) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1985. The oldest operating unit is Unit GT1 (1972); the newest is Unit GE1 (2002).
When is it due to retire?
No retirement date has been filed for any operating unit at APS Saguaro Power Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $9.91M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
127,427 t in 2023, reported to the EPA — the 2,047th highest of 6,030 US facilities that reported. Up from 7,065 t in 2011.