AMERICAN ENERGY ATLAS
Industrial + power·Minnesota

American Crystal Sugar - Moorhead

Moorhead, Clay County, Minnesota · SPP · operated by American Crystal Sugar Co · owned by American Crystal Sugar Co

2023 · headline year
Fuel spend$10.3M2023 · estimate
Capacity in service5.0MW2 units · coal
Net generation39.8GWh2023 · reported
CO₂ emitted312,834t2023 · reported to EPA · 1,210th highest of 6,030 in the US
Rank in Minnesota#179 (tied)of 767 · by capacity · #6,619 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor91%2023

Location

Clay County · SPP · MRO

What its on-site power plant burns

2023 · reported

Share of reported fuel consumption

100% Coal · 1.98 TBtu · reported · $6.81M est.

CO₂ emitted, t · 2011–2023

0200,000400,000600,000201120172023
Reported (through 2023)

Generating units

2 of 2 shown · 5.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit G13.0SubbituminousConventional Steam Coal1948Operating
Unit G22.0SubbituminousConventional Steam Coal1961Operating

All 2 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
American Crystal Sugar Co · 100%
Operating utility
American Crystal Sugar Co
Entity type
Industrial
Regulatory status
Not Regulated
Industry sector
Minerals, Waste
EPA facility ID
1006877
Balancing authority
SPP
NERC region
MRO
EIA plant ID
54211

Common questions

How big is American Crystal Sugar - Moorhead?
5.0 MW across 2 generating units in service.
Who owns and operates it?
Owned by American Crystal Sugar Co (100%) and operated by American Crystal Sugar Co, filed as industrial.
Which grid does it sell into?
SPP (Southwest Power Pool) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 1953. The oldest operating unit is Unit G1 (1948); the newest is Unit G2 (1961).
When is it due to retire?
No retirement date has been filed for any operating unit at American Crystal Sugar - Moorhead. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned coal.
How much does it spend on fuel?
An estimated $10.3M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
312,834 t in 2023, reported to the EPA — the 1,210th highest of 6,030 US facilities that reported. Down from 312,941 t in 2011.

Related pages

Minnesota energyAll facilities in the state→Windshare LLC5.4 MW operating capacity→ Lincoln Heights I5.2 MW operating capacity→ Andromeda Community Solar5.0 MW operating capacity→ B.R. Corcoran CSG5.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming