AMERICAN ENERGY ATLAS
Power·Massachusetts

ZPD-PT Solar Project 2017-038 Hybrid LLC

Worcester County, Massachusetts · ISO-NE · operated by AES Distributed Energy

2023 · headline year
Fuel spend$02023 · no purchased fuel
Capacity in service8.5MW2 units · solar + storage
Rank in Massachusetts#70 (tied)of 666 · by capacity · #5,851 (tied) of 13,147 US

Location

Worcester County · ISO-NE · NPCC

Generating units

2 of 2 shown · 8.5 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit DRAPV5.0SolarSolar Photovoltaic2021Operating
Unit DRAES3.5StorageBatteries2021Operating

All 2 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases.

See the engineering record →

Ownership & operations

Operating utility
AES Distributed Energy
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
ISO-NE
NERC region
NPCC
EIA plant ID
64147

Common questions

How big is ZPD-PT Solar Project 2017-038 Hybrid LLC?
8.5 MW across 2 generating units in service — 5.0 MW of solar and 3.5 MW of storage.
Who owns and operates it?
Operated by AES Distributed Energy, filed as independent power producer.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 2021. Every operating unit came online in 2021.
When is it due to retire?
No retirement date has been filed for any operating unit at ZPD-PT Solar Project 2017-038 Hybrid LLC. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (5.0 MW) and Batteries (3.5 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (batteries and solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.

Related pages

Massachusetts energyAll facilities in the state→West Haydenville PJ Community Solar8.6 MW operating capacity→ High Street Station8.5 MW operating capacity→ 160 Tihonet Rd Hybrid(CSG)8.3 MW operating capacity→ 276 Federal Rd(CSG)8.3 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming