Newnan, Coweta County, Georgia · SOCO · operated by Georgia Power Co · owned by The Southern Co
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit 6 | 403.7 | Natural Gas | Natural Gas Steam Turbine | 1974 | Operating |
| Unit 7 | 403.7 | Natural Gas | Natural Gas Steam Turbine | 1974 | Operating |
| Unit 10 | 482.8 | Natural Gas | Natural Gas Fired Combustion Turbine | 2027 | Proposed |
| Unit 8 | 482.8 | Natural Gas | Natural Gas Fired Combustion Turbine | 2026 | Proposed |
| Unit 9 | 482.8 | Natural Gas | Natural Gas Fired Combustion Turbine | 2027 | Proposed |
| Unit 4 | 156.2 | Bituminous coal | Conventional Steam Coal | 1957 | Retired 2015 |
| Unit 5 | 156.2 | Bituminous coal | Conventional Steam Coal | 1958 | Retired 2015 |
| Unit 1 | 122.5 | Bituminous coal | Conventional Steam Coal | 1950 | Retired 2015 |
| Unit 2 | 122.5 | Bituminous coal | Conventional Steam Coal | 1950 | Retired 2015 |
| Unit 3 | 122.5 | Bituminous coal | Conventional Steam Coal | 1952 | Retired 2015 |
All 10 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit 8 | new unit | 2026 | 483 MW |
| Unit 10 | new unit | 2027 | 483 MW |
| Unit 9 | new unit | 2027 | 483 MW |
| Supplier | Fuel | Delivered MMBtu | Tons | Mine of origin | Transport |
|---|---|---|---|---|---|
| Boswell Oil | Oil & petroleum | 791 | n/a | n/a | Truck |
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
The supplier is shown. Subscribe to see every one of the 367 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
See the delivery history →